KJ 조선소

Infrastructure Status

Infrastructure Status

We will strive to provide many services such as old equipment renewal, repair, new equipment introduction and shipbuilding.

  • Installed 40m(H) x 70m(L) Tower Crane
  • Purchased 2 6m(H) Fork Lift
  • Purchased 2 sets of high-pressure washing machines (600bar)
  • Purchased 14m ladder vehicles
  • Purchased 18.5m ladder vehicles
  • Installed 250m of gas pipe per each Marine Railway
  • Extension construction (1,000kw)
  • 2 Sets of Renewed Wire Rope
  • Repaired Marine Railway
  • Pier (30m x 40m) repair
  • Building Construction and Remodeling
  • Shipyard Railway

    • GT 5,200 ton
      Light Condition 2,800ton
    • GT 6,500 ton
      Light Condition 3,000ton
  • Inner Wall

    • 30m x 40m